Home/Services/Sheds & Playsets
Sheds & Playsets · Memphis, TN
Sheds, playsets and trampolines — anchored and square.
Outdoor builds on your prepared base, squared so the doors still shut in a year, and anchored to the manufacturer's safety spec — which is the step almost everybody skips.
- Licensed & insured
- Flat quote up front
- Packaging hauled off

What's included
Everything, in one flat number.
No line-item surprises at the end. If it's on this list, it's in the quote.
- Built on your prepared base, checked square and level before it's fastened down
- Doors and windows aligned so they still latch after the first wet season
- Seams, roof and trim sealed to the manufacturer's weather spec
- Playsets and swing sets anchored per the safety spec, not just set on the grass
- Trampolines assembled with net, pads and ground anchor kit installed
- Pergolas, gazebos and patio sets built and secured
- Grills, smokers and outdoor furniture assembled in the same visit
- Pallets, crates, banding and packaging hauled off
What we build outside
If it's on this list, we've done it.
- Resin sheds
- Metal sheds
- Wood sheds
- Storage buildings
- Playsets & swing sets
- Trampolines
- Pergolas & gazebos
- Patio furniture sets
- Grills & smokers
- Outdoor kitchen islands
- Fire pits
- Dog kennels & runs
- Raised garden beds
- Trash & bin enclosures
- Deck boxes
- Basketball goal bundles
The process
What the visit actually looks like.
Start to finish, most sheds & playsets jobs are done in one visit.
Confirm the base and the spot
We check your pad or base, walk the placement with you, and flag drainage or slope problems before anything gets built on top of them.
Build in place, square
Assembled where it's going to live, checked square on the diagonals, and fastened down so it stays that way.
Anchor, seal and clear out
Ground anchors in, seams sealed, safety spec verified, and every pallet and crate off the property.
Recent work
Straight from the truck.
Real jobs, real Memphis houses.
FAQ
Sheds & Playsets — common questions
Do you prepare the pad or base for a shed?
We build on a base that's ready to go. If you don't have one yet, call before you order the shed — a gravel pad, a slab and bare dirt are three different jobs, and getting that wrong is what makes a shed door stop closing two seasons later.
How long does a shed take?
A typical resin or metal shed is a single visit. Larger wood buildings can run into a second day depending on size, roof pitch and how far the material has to be carried from the driveway.
Do you anchor playsets and trampolines?
Always. It's the part people skip and the part that matters most with kids on it. We install the manufacturer's anchor kit, or proper ground anchors if what shipped isn't up to it — and we'll tell you which one you've got.
Will it hold up in a Memphis storm?
Anchoring is the whole answer. Mid-South straight-line winds move unanchored sheds and trampolines every spring, so we anchor to spec on every outdoor build and won't leave one sitting loose.
Also available
While we're out there.
Bundle jobs into one visit and it's one trip, one quote, one afternoon.
TV Mounting
Flat screens on drywall, brick, stone and tile — level, solid, and with the cords put away.
Learn moreFurniture Assembly
Beds, dressers, desks, wardrobes, cribs, office chairs. Flat-pack in, furniture out, boxes gone.
Learn moreBasketball Goals
In-ground and portable goals assembled, anchored and set square — including the concrete work.
Learn moreLet's get your sheds and playsets handled.
Send a photo and you'll get a firm, all-in quote back — usually the same day.